|
HEAT
RECOVERY SYSTEM
Flash
- Economizer Heat Recovery System
Most
boiler manufacturers and water treatment companies
recommend boiler water TDS be maintained at certain
levels. The purpose of continuous blowdown is to
continuously take boiler water from 4" - 6" under
the surface where the TDS is at its highest concentration
so that it can be replaced with fresh water. While
continuous blowdown is the best way in controlling
these solids in the boiler the heat lost to drain
over time can be tremendous. Penn Continuous Blowdown
Heat Recovery Systems can recover 90% or more of
this heat normally lost. Two stages provide the
heat recovery. The first is the flash area where
the high pressure condensate flashes to a low pressure
steam use such as a feedwater heater or deaerator.
In the second area is a heat exchanger that transfers
the remaining heat to the make-up water.
- Complete
System frame mounted with the necessary controls
in a vertical design to save valuable boiler room
space.
- ASME
Code rated flash chamber with a tangential
inlet and a centrally located vent providing 97%
quality steam.
- Ease
of Maintenance because
of the flanged vertical drop down coil section
and external controls.
- Multiple
Boilers can use a single system even if at
different pressures. Unit operates at lower venting
pressure.
|
|
|
|